Introduction

Isometrico-AsturiasReal.png

Asturias Real was a project undertaken as part of my Civil Engineering degree thesis. In this project, I assumed the role of BIM Manager for a team of 12 coworkers. The team composition included a BIM coordinator, two geotechnical engineers, two structural designers, two MEP specialists, two environmental leaders, and two budget engineers and a BIM Manager.

The project's aim was to collaboratively develop fundamental engineering designs, encompassing geotechnical, structural, hydrosanitary, sustainability, and socio-environmental aspects. This encompassed the creation of bid and/or construction documents necessary for the physical construction of spaces within the "Asturias Real Residential Complex" project. The implementation of the BIM methodology was integral to this project, aligning with the client's sustainability requirements.

Project Length: June. 2020 – July. 2021

Disclamer

This informative website is a condensed version of the complete project. In this particular case, the focus will be placed on the collaborative efforts of the team members who held the roles of BIM coordinator and BIM Manager.


“When we build, let us think that we build forever” John Ruskin


Develop BIM Execution Plan

Below is a sample of the developed BIM Execution Plan

BIM Execution Plan Sample.pdf


Define the BIM uses

BIMUSES.png

CDE folder Structure

CDE.png

Guarantee Quality of Deliverables

QUALITY.png

Classification System

CLASIFICATION.png

Coordination Plans

PLANS.png

Define LOD Standards

LOD.png

Bill of Quantities export

BOQ.png


3D Model Coordination of all disciplines (Architeture, Structure & MEP)

SampleCoordination.png

Developing 4D simulations of the project's construction process

Simulacion.mp4